ASCE Member Insurance Blog

Claims Retrospective: Subrogation Demystified

Posted on 6/15/2017 by ASCE Insurance in civil engineering engineers insurance subrogation

Meticulous Engineer was hired to do the calculations for the demolition plans in connection with the renovation of Old Warehouse. The drawings indicated that part of Old Warehouse was to be demolished and a small addition was to be added to the remaining part of Old Warehouse. Unfortunately, Destroy Contractors, the demolition contractor, did not follow the demolition plans, causing a collapse to part of Old Warehouse that was intended to be restored and reused.

read more..